Charterbuild

Case Studies

case studies


Type of structure:

Temporary structure for Wembley Arena.

Problem:

Large temporary structure requiring holding down.

Solution:

Refurbishment of Wembley Arena required the erection of a large temporary marquee to house the stage and seating. Built on the car park adjacent Wembley Stadium, the structure was built on a scaffold platform.

Duration:

2 weeks.

Photos: